Disable Preloader
म.प्र.म.क्षे.वि.वि.कं.लि.,भोपाल (
सरल संयोजन पोर्टल
)
Helpline : 0755-2551222 / 1912
Home
New Connection (LT)
Track Application
Other Useful Link
Apply For Other Services (Saral Sanyojan)
Download Payment Receipt
New Service Connection Charges Calculator
Load Change Charges Calculator
Other LT Services & Old Portal (URJAS)
Deposit and Supervision Portal
Register / Link your mobile number
User guide
DOWNLOAD SOP FOR NEW SERVICE CONNECTION
DOWNLOAD SOP FOR METER REPLACEMENT
DOWNLOAD SOP FOR LOAD CHANGE
DOWNLOAD SOP FOR NAME CHANGE
DOWNLOAD SOP FOR TARIFF-CATEGORY CHANGE
Department Login
Circle / Division / Dc Login
Corporate Login
Calculate Load Change Charges
Calculate Load Change Charges
Premise Type
*
---Select---
RURAL
URBAN
Connection Category
*
---Select---
LV1 - DOMESTIC
LV2 - NON DOMESTIC
LV3.1 - PUBLIC WATER WORK
LV3.2 - STREET LIGHT
LV4 - INDUSTRIAL(IP)
LV5 - AGRICULTURE
LV6 - E-VEHICLE/E-RICKSHAWS CHARGINING STATIONS
Connection Type
*
---Select---
Old Load
*
Old Phase
*
---Select---
Load Unit
*
New Load
*
New Phase
*
---Select---
Premise Colony Type
*
---Select---
Developed Legal Area
Electrified Multiuser Complex/New residential Colonies
Load Approved Multiuser complex.Full supply affording charges deposited.
Individual Consumer with estimated load above 50 KW and extension work is already done
Un-Electrified Slum area
Declared Illegal Colony
Undeclared Illegal Colony
Premise Colony Type
*
---Select---
Supply Affording Charges Excluding Infrastructure.
Supply Affording Charges including Infrastructure.
Charges Detail For Load Change (
)
Registration Charge (
)
Meter Cost (non-smart / smart)(if applicable) (
)
Security Deposit (
)
Supply Affording (
)
/
Calculate
Apply For Other Services
LT Nsc
Meter Replacement
Load Change
Name Change
Tariff Change
| निर्बाध बिजली संकल्प हमारा । संतुष्ट उपभोक्ता लक्ष्य हमारा |